REFERENCES

The main business focus of ATM BG d.o.o. Novi Beograd is the client and his satisfaction, as well as the constant improvement and upgrading of the skills and expertise of employees to the level of professionalism.

We have highlighted some of the projects we are proud of, but the list of our references is much longer.

03.2021 - 12.2022.

Construction of the overhead contact line and infrastructure facilities on the Stara Pazova - N.Sad railway for speeds up to 200 km/h

  • Construction of overhead contact line for speeds up to 200 km/h.
  • Construction of infrastructure in station buildings.
  • Construction of pole transformer stations 25/0.242kV.
  • Construction of distribution transformer stations 20(10)/0.4kV.

03.2021 - 12.2022.

Construction of an overhead contact line power plant on the Stara Pazova - N.Sad railway for speeds up to 200 km/h, local and remote control, and a remote control center

Reconstruction, modernization, and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – state border (length 40.44 km). Stara Pazova-N.Sad section Phase II – general construction infrastructure and electrotechnical infrastructure for the construction of the overhead contact line and power plants for speeds up to 200 km/h.

07.2021 - 12.2022.

Reconstruction and modernization of the railway line Subotica - Horgoš - state border

  • Construction of overhead contact line for speeds up to 120 km/h.
  • Sectional plants for powering the overhead contact line, and local control.
  • Construction of infrastructure in station buildings, pole transformer stations 25/0.242kV, i.e. relocation and protection of cables.
  • Construction of SS and TT plants and devices.

2019 -

Modernization of technical and passenger station ZEMUN

  • Construction of a new and reconstruction of the existing overhead contact line.
  • Construction of pole transformer stations.
  • Construction of train preheating plant – 4 pieces.
  • Delivery and installation of equipment for testing electrical installations in wagons.

06.2019 - 08.2021.

Construction of the trolleybus overhead contact line and its infrastructure in the function of the terminus on Dunavska Street

  • Construction of the correctional station building.
  • Overhead contact line power supply.
  • Construction of a trolley bus overhead contact line for powering city traffic vehicles.
  • Construction of a rectifying station for powering the overhead contact line.
  • Telecommunication and signaling installation in the rectification station.
  • Supply of traffic lights and public lighting.

08.2019 - 04.2021.

Construction of works in Nemanja Street from Knez Miloš to Slavija

Preparation of technical documentation with the execution of overhead contact line works in Nemanjina from Kneza Miloša Street to Slavija.

06.2023 -

Measurement of the geometric characteristics of the overhead contact line on the lines of HŽ Infrastructure

Measurement of the geometric parameters of the overhead contact line in the length of 1,193 km on the railways in the Republic of Croatia.

10.2018 - 04.2019.

Construction of the Žeželj Bridge over the Danube River in Novi Sad

  • Construction of the overhead contact line on the Žeželjev bridge on the Danube.
  • Installation of signaling and safety devices.
  • Installation of telecommunications facilities.

2017 - 2019.

Reconstruction of the overhead contact line, the plant for its power supply, and the station infrastructure on the railway section: Rasputnica "G" - Rakovica - Resnik

  • Construction of a new and reconstruction of the existing overhead contact line.
  • Construction of pole transformer stations.
  • Carrying out works on railway station infrastructure.
  • Construction of an electric traction substation and a sectioning plant for powering the catenary network.

31.08.2016 - 15.11.2017.

Reconstruction of the overhead contact line on the railway section: Belgrade (Resnik) - Valjevo

  • Execution of construction and electrical installation works in the length of 117.6 km of overhead lines.
  • Installation of steel structures.
  • Installation of equipment of cantilever columns and rigid portals.
  • Catenary lines.

12.2014 - 01.2016.

Reconstruction of the overhead contact line at the main railway station Belgrade - Centar

  • Reconstruction of the existing overhead contact line.
  • Construction of pole transformer stations.

07.2014 - 12.2015.

Carrying out works on the overhead contact line for the second railway track on the section Pančevački most - Pančevo Glavna

  • Construction of an overhead contact line on a double-track railway.
  • Construction works.
  • Steel construction.
  • Columns and portals.
  • Connecting to the overhead contact line.

06.2014 - 07.2015.

Reconstruction of the tram overhead contact line at the locations: Autokomanda intersection, Autokomanda - Banjica turnpike

Carrying out works on the tram overhead contact line, control, heating, and signaling of tram points – Autokomanda roundabout, Autokomanda – turnpike on Banjica.