Orderer:
Serbian Railways JSC
Contractor/General Contractor:
RŽD International-Branch Belgrade
Project status:
Finished
Realization period:

03.2021 – 12.2022.

Value of completed works:

24,310,325.91 €

PROJECT NAME

Construction of the overhead contact line and infrastructure facilities on the Stara Pazova - N.Sad railway for speeds up to 200 km/h

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Construction of overhead contact line for speeds up to 200 km/h.

– Reconstruction of railway station buildings
– Construction of pole transformer stations 25/0.242kV, respectively
– Construction of distribution transformer stations 20(10)/0.4kV

Brief description of works

Construction works, steel structures, pillars and portals, disassembly, installation of equipment for cantilever pillars and rigid portals, equipment for tensioning lines, overhead lines, connection to the overhead contact line, grounding, testing, and commissioning.

– Installations in stations and public protection system
– Powering the heaters of switch systems in stations, i.e. the security system and telecommunication devices on open tracks,
– Distribution transformer stations 20(10)/0.4kV for powering buildings next to railway lines for various purposes

Related project

Construction of an electric traction substation on the Stara Pazova - N.Sad railway for speeds up to 200 km/h, local and remote control, and a remote control center