Orderer:
Serbian Railways JSC
Contractor/General Contractor:

RŽD International-Branch Belgrade

Project status:
Finished
Realization period:

03.2021 – 12.2022.

Value of completed works:

5,248,527.96 €

PROJECT NAME

Construction of an electric traction substation on the Stara Pazova - N.Sad railway for speeds up to 200 km/h, local and remote control, and a remote control center

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Construction of an electric traction substation and a sectioning plant for powering the catenary network.
Construction of local and remote control, remote control center.

Brief description of works

Delivery and installation of high-voltage 110kV (single-pole disconnectors, switches with electric drive, measuring transformers, energy transformers 110/27.5kV) and medium-voltage equipment (single-phase withdrawable cells with switching and measuring equipment), protective microprocessor devices, DC and AC auxiliary distributions, connection to the input lines, that is, to the transmission lines to the overhead contact line lines.
Cable laying, RTU equipment, remote control equipment (servers and system software for data storage, control systems, application and communication servers, maintenance workstations, protective equipment, switches, LCD screens with control devices), training of operating and maintenance personnel.

Related project

Construction of the overhead contact line and infrastructure facilities on the Stara Pazova - N.Sad railway for speeds up to 200 km/h