Orderer:
Ministry of Construction, Transport and Infrastructure
Contractor/General Contractor:

KARIN KOMERC

Project status:
Finished
Realization period:

07.2021 – 12.2022.

Value of completed works:

16,704,927.89 €

PROJECT NAME

Reconstruction and modernization of the railway line Subotica - Horgoš - state border

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Construction of overhead contact line for speeds up to 120 km/h.
Sectional plants for powering the overhead contact line, and local control.
Construction of infrastructure in station buildings, pole transformer stations 25/0.242kV, i.e. relocation and protection of cables.
Construction of SS and TT plants and devices.

Brief description of works

Construction works, steel structures, pillars and portals, disassembly, installation of equipment for cantilever pillars and rigid portals, equipment for tensioning lines, overhead lines, connection to the overhead contact line, grounding, testing, and commissioning.
Delivery and installation of medium-voltage equipment (single-phase withdrawable cells with switching and measuring equipment), protective microprocessor devices, DC and AC auxiliary distributions, and connection to input lines.
Construction of equipment and energy installations for the operation of public lighting in stations. Construction of pole transformer stations 25/0.242kV, 100kVA, for powering switchboard heaters and SS and TT installations.
Construction of electronic control devices with the necessary electronic and mechanical components and with the necessary software modules.

PROJECT PHOTOS

GALLERY

Shopping Basket