Construction and electrical installation works in the length of 117.6 km of overhead lines, assembly of steel structures, pillars, and portals, dismantling, installation of equipment for cantilever pillars and rigid portals, equipment for tensioning lines, overhead lines, connection to the overhead contact line, grounding, testing, commissioning. The complete railway is composed of 10 open tracks and 10 stations, one tunnel.