Orderer:
Serbian Railways JSC
Contractor/General Contractor:
Leader of the consortium: ENERGOPROJEKT OPREMA a.d
Project status:
Finished
Realization period:
12.2014 – 01.2016.
Value of completed works:
592,149.93 €

PROJECT NAME

Construction of the main railway station Belgrade - Center

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Reconstruction of the existing overhead contact line.
Construction of pole transformer stations.

Brief description of works

Execution of construction works, installation of columns, rigid and flexible portals, rigid and automatic tensioning, and lines. Installation and operation of manual disconnectors.
Construction and electrical assembly work on the construction of pole transformer stations 25/0.242kV, 50, and 100kVA – 4 pieces for powering switch heaters and as a backup power supply for signaling and safety devices.