Orderer:
The City of Belgrade, City Administration of the City of Belgrade, Agency for Investments and Housing
Contractor/General Contractor:
JV “Ratko Mitrović niskogradnja” d.o.o., “SŽ ŽGP Ljubljana”
Project status:
Finished
Realization period:
06.2014 – 07.2015.
Value of completed works:

167,067,115.94 RSD

PROJECT NAME

Carrying out works on the reconstruction of the tram double-track railway, tram overhead contact line, pavement, sidewalks, and infrastructure in Vojvode Stepe Street, from Autokomanda to the turnpike at Banjica

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Carrying out works on the tram overhead contact line, control, heating, and signaling of tram points – Autokomanda roundabout, Autokomanda – turnpike on Banjica.

Brief description of works

Construction works, steel structures, pillars and portals, disassembly, installation of equipment for cantilever pillars and rigid portals, equipment for tensioning lines, overhead lines, connection to the overhead contact line, grounding, testing, and commissioning.
Controlling the operation of switches, their heating, and signaling.