Orderer:
City of Belgrade, Administration of the City of Belgrade, Secretariat for Communal and Housing Affairs, Directorate for Building Land and Construction, Belgrade, JP
Contractor/General Contractor:
ATM BG d.o.o – Novi Beograd
Project status:
Finished
Realization period:

06.2019 – 08.2021.

Value of completed works:

393.070.805,61 RSD

PROJECT NAME

Construction of the trolleybus overhead contact line and its infrastructure in the function of the terminus on Dunavska Street

Basic characteristics of the project

Brief description of works

Basic characteristics of the project

Construction of the correctional station building.
Overhead contact line power supply.
Construction of a trolley bus overhead contact line for powering city traffic vehicles.
Construction of a rectifier station for powering the overhead contact line.
Supply of traffic lights and public lighting.

Brief description of works

Architectural and construction works on the construction of the building to house the rectifier transformer station, i.e. it’s greening.
Construction works and electrical assembly work on the construction of the route of cable lines for powering the trolleybus overhead contact line in the central city core.
Construction works, steel structures, pillars and portals, disassembly, installation of console equipment, line tensioning equipment, driving, power, and reinforcement lines, connection to the overhead contact line, grounding, testing, and commissioning.
Distribution plant of distribution voltage 10/0.4kV, rectifier plant (transformation 10/0.52kV, rectifiers, distribution plant 660V, DC), and their connection to the overhead contact line.
Structural cable system, video surveillance system, stable fire alarm installation.