Annual report on accidents and incidents for 2024. carrier for its own needs “ATM BG” d.o.o. New Belgrade

Annual report on accidents and incidents for 2024. carrier for its own needs “ATM BG” d.o.o. New Belgrade
The “Savska Street project” – The reconstruction of the overhead contact line in Savska Street is ongoing.
As part of the regular ongoing maintenance of the Railway Infrastructure of Montenegro, we measured and recorded the geometric parameters of the catenary on the tracks Bijelo Polje – Bar and Niksic – Podgorica.